Construction works
Industrial epoxy flooring
Industrial flooring systems — epoxy, polyurethane and anti-static floors and protective floor painting — for production halls, warehouses, workshops, garages and commercial spaces. We choose the system according to the use, the substrate and the load, and we prepare the substrate by grinding.
- Systems
- Epoxy and polyurethane
- Preparation
- Concrete grinding
- Use
- Halls, garages, plants
- Execution
- Our own crews
What we do
A floor that stands up to forklifts, oil and washing.
The floor is the surface that takes the most punishment in a building — wheels, impacts, chemicals and water. That is why we choose the system according to what will be driven over it and what will be spilt on it, not from a colour chart.
We work in existing halls, garages and commercial spaces, and in buildings we construct ourselves. When a hall is built from scratch, the steel structure, panels and floor all come under one contract and one deadline.
-
Epoxy floors
For spaces that need a hard, level and resistant finish — industrial halls, warehouses and production plants. Seamless, abrasion-resistant and easy to clean.
-
Polyurethane floors
Chosen according to the building's use and the conditions the floor will be exposed to — they are more elastic than epoxy and cope better with UV radiation and temperature differences.
-
Concrete grinding and preparation
We check the condition and moisture of the substrate, fill the cracks, and then grind off laitance, old coatings and dirt. How long the floor lasts depends on the preparation.
-
Anti-static flooring systems
For spaces where the build-up of static electricity has to be controlled — sensitive electronics, server rooms and production plants.
-
Protective floor painting
For spaces that don't need a complete multi-layer flooring system — a protective coating over a prepared substrate.
-
Garages and car parks
Floors resistant to tyres, oil and salt from winter roads, with marked bays, walkways and columns.
How we work
From bare concrete to a finished floor
The completion time depends on the floor area, the condition of the substrate and the chosen system — we put the exact time in the quote, after a site visit.
-
01
Substrate assessment
We check the strength and moisture of the concrete, cracks and old coatings, and what load the floor will carry. That determines the choice of system.
-
02
Filling cracks
We fill cracks and damage in the substrate before grinding, so that the surface is level and sealed.
-
03
Grinding and cleaning
Machine grinding and dust extraction — the concrete is clean and open for the primer.
-
04
Primer
The base coat penetrates the pores of the concrete and bonds the following layers to the substrate.
-
05
Applying the system
An epoxy, polyurethane or anti-static system — with decorative flakes if desired — or a protective coating, depending on the use of the space.
-
06
Topcoat and handover
A protective topcoat, line marking where needed and handover of the floor.
Our work
Floors we have laid
Industrial halls, warehouses, garages, food-processing plants and commercial spaces across Montenegro. Click a photo to enlarge.
Halls, warehouses and plants
Garages
Commercial spaces and institutions
Preparation and application
Frequently asked questions
Before you send an enquiry
Epoxy or polyurethane — which is better?
It depends on the space. Epoxy is harder and more resistant to chemicals and abrasion — the standard for industrial halls and warehouses. Polyurethane is more elastic and copes better with UV radiation and temperature differences. They are often combined: an epoxy base with a polyurethane topcoat.
Can epoxy go on old concrete or an old floor?
Yes, if the substrate is sound. Cracks and damage are filled first, and old coatings, oil and laitance are ground off. A damp or crumbling substrate has to be dealt with first — we check that during the site visit.
When can the floor be used?
As a rule, foot traffic is possible after a day or two, and full loads — forklifts and vehicles — after a few days. The exact schedule depends on the system and the temperature, so we give it for each project separately.
Is an epoxy floor slippery?
A smooth glossy floor can be slippery when wet. Where that matters — entrances, washing areas, work with liquids — we choose the system and topcoat accordingly; our recommendation comes with the quote.
Do you also do floor painting only?
Yes. For spaces that don't need a complete multi-layer system, we do protective painting of floor surfaces — with the same substrate preparation.
What do you need for a quote?
The floor area, the use of the space (what is driven over it and what is spilt on it) and a few photos of the existing substrate. With that we give an indicative price, and the final one after a site visit.
How much does a floor for your space cost?
Send us the floor area, the use and a few photos of the existing substrate. After a site visit you'll receive a proposed system, a price and a completion time.
Seven services — one contractor