Sandwich panels and sheet metal work

Refurbishment of the HDL logistics centre

Removal of the old facade panels from the HDL logistics centre in Dajbabe and installation of new sandwich panels on a steel substructure, from a cherry picker.

Work
Panel removal and installation
Location
Podgorica
Year
2026
Installation of facade sandwich panels from a cherry picker on a building with a steel structure
Installing the new panels
Removing old sandwich panels from the facade of a large building, scissor lift next to the wall
Removing the old panelsThe removed panels expose the building's steel structure.
Installation of facade sandwich panels from a cherry picker on a building with a steel structure
Installing the new panelsPanels are fixed to the steel substructure from a cherry picker.